Three plastic(HK)group limited
Three plastic product Information
-Design time: 3days
-Cavity: Single/Multi cavities
-Tolerance: 0.02mm
-Mould type: rapid prototyping, JIG, multi-component tools, two-component tools, Multi-cavity tools, Silicone molding, aluminium tools, overmoulding, double direction molding, toolmakers and molded plastic components
-Mould base: HASCO
-T1 Delivery time: 20 days
-Product Material: ABC, PC, PP, PVC, POM, PMMA, PS, PE. PET, PA, ABS+PC
-Special (PEI+ carbon fiber, PA6/PA66+GF, PBT+GF, PBT, PEI, PA6+TD)
Who are we?
1: Producer of die mould for electronics products, small auto parts, toy, industrial parts, plastic parts & die casting.
2: Mold design, mold-making, product design, mold flow analysis, injection products. silkscreen. Painting and assembly service
Three Plastic Team?
-30% mold designer over more than 15 design experience
-50% mold engineers have more than 20 years in engineering
-50% management & development staff have study abroad in US, Japan, Germany
Three Plastic technology?
-Plastic mould
1: Molding technology
*Injection molding
*In-Mold technique
*Insert technique
*Mechanical processing
*NC Cutting
2: Composite technique
*Laser processing
*Vacuum deposition
*UV Coating
*Bronzing
*Optical processing
*Aluminum sculpture
*Sputtering coating
3: Printing
*Silk printing
*Pad printing
*3D printing
-Die casting mould
1: Aluminum casting
*Anodizing
*Sandblasting
*Oxidation
*Powder
*Electrophoresis
*Painting
2: Zinc alloy
*Electroplating
*Fused
*Powder
*Spray
Three Plastic Quality System?
*IQC-IPQC-OQC
*Initial sample test reports
*Check list of Material
*Dimension testing reports
*DFM reports
*Mould progress reports
*SGS
*8D reports etc.
*Full testing reports
Other Information
Three Plastic Vision:
-Change the craft goods into industrial goods
-Building large industrial park for composite processing techniques with metal and plastic materials
FAQ
Q: What type format drawing you offering and design?
A: Design software: UG-NX 7, PROE 5.0
Engineer drawings: X_T, IGES, STEP, Pro-E
Q: How about the working time?
A: 2 shifts, 6 days a week for production line workers, 10 working-hours per day, two hours belongs to overtime.
Q: How about your yearly production turnover, annual output of mold?
A: At 2013, our yearly turnover is 3.5 million USD, The annual output around 150 sets of mold.
Q:How many worker staff in your factory?
200 employees of Dec of 2014, 5 designers, 5 quality staff, 50 people in mold department, 80 people in injection department.
Q: Whether the new employees need training while they enter the factory?
Yes, all new employees got training for three month before starts working
Q: What's normally mold steel supplier? Any material certificated provides?
A:-LKM, GS, Ming lee, DAIDO are our general supplier.
- US standard mold steel: P20,420,H13,D2
-Germanystandard mold steel: 1.2738, 1.2311, 1.2711, 1.2316, 1.2083, 1.2344, 1.2379
-Steel and harden reports treatments certification supply
Q: Is there a mold flow analysis before making the mold? Which software do you use often?
A:Yes, with mold flow analysis, normally use MPI, MPA software which are owned by American mold Flow Company.
Q:What should you do while mold does not work at client factory?
A:We will give a careful inspection for the mold to avoid such case before delivery. But if it happens, we will decide whether to reproduce the mold according to customer's feedback.
Q: Where are your major customers and what manufacture standards have you mastered?
A: Our major market isJapan, Europe North America
We usually use HSACO, DME & MISUMI standard to produce the mold.
Q: What do you like to use hot runner? Which brand do you use normally?
A: DME, HASCO, YUDO, SYNVENTIVE, MOLDMASTER, INCOE
HASCO, YUDO, Mold Master (Used most)
Packaging and Delivery
Packaging:
- For exported mould, Customized wooden box.
-For molding parts, normally trays and carton for package.
- We can design package and accept clients' customized package.
Shipment:
- Have Contract price as VIP client of UPS, FedEX, DHL, Faster
- Exclusive logistics agent, Cheaper
- Sea freight to US 25 days, Air freight toJapan1 day, Sear freight to EU 22days.
Payment
TT/TC
Delivery
express,sea transportation,air transportation
Origin
Dongguan city,China
Packaging
wooden case/carton
Inspection
Available
Samples
Free
Contact: Constantine Chen / Account manager
Email: constantine@threeplastic.com
Contact person: Mr. Constantine Chen
Position: Account manager
Mobi:
Phone: +8676982288608 - Fax:
Address: No.1, 6th Yincheng Road, Xiabian District, Chang'an Town, Dongguan, Guangdong, China
Country: China